After all the MSD wiring has been installed inside the vehicle, Dan and Kevin removed the intake and cylinder heads. Waiting on the new cylinder heads to arrive and installation can begin.
DRIVER SIDE OF BLOCK CLEANED AND PREPPED FOR NEW CYLINDER HEAD
PASSENGER SIDE OF BLOCK CLEANED AND PREPPED FOR NEW CYLINDER HEAD
Posted in Uncategorized