Uncategorized

Update*

February 8, 2011

Brackets on the way to be powder coated

Read More

NiteMare

February 8, 2011

Today the valve covers and intake are installed and the exhaust is going back on.   Just a few more parts to wait on before the blower can be installed.

Read More

Update

February 7, 2011

After a few hours labor, the cylinder heads, intake and fuel rail are installed.  New valve covers will arrive shortly.   MSD Distributor arrived today.

Read More

NiteMare Update

February 7, 2011

      Dan is installing the Edelbrock Cylinder Heads today.

Read More

Engine disassembly

February 2, 2011

After all the MSD wiring has been installed inside the vehicle, Dan and Kevin removed the intake and cylinder heads.  Waiting on the new cylinder heads to arrive and installation can begin.   DRIVER SIDE OF BLOCK CLEANED AND PREPPED FOR NEW CYLINDER HEAD PASSENGER SIDE OF BLOCK CLEANED AND PREPPED FOR NEW CYLINDER HEAD

Read More

NiteMare Update

February 2, 2011

Today we are installing the MSD ignition.  Lots of wiring ahead……

Read More

**NiteMare update**

February 1, 2011

Today was fuel system day. Installed the 255 Walboro and T-Rex fuel pumps for the Supercharger, all wired in and ready to go.                 

Read More

Project NiteMare

January 28, 2011

The Vortech Supercharger has arrived!!!  

Read More

Update

January 28, 2011

The manual steering gear has been installed.  Now,  NiteMare is on its way to Alignment Professionals. 

Read More

Project NiteMare update

January 27, 2011

This wait is over,  the parts have started to come in.  Received the Trick Flow upper and lower intakes today along with the manual steering gear kit.  Still waiting on several other components to arrive before the engine mods can start.  Here is a picture of the engine compartment in its current state.    …

Read More